Asbury Park Hotel (Salvation Army Hotel)

ashbury-hotel-completed-3
5th floor

5th floor planned as outdoor gathering area.

Laurenco SPC was applied as temporary roof to dry-in allowing interior work to begin.
Adhered Insulation and coverboard — First layer of insulation adhered in Laurenco Adhesive.
2-layer Laurenco Waterproofing System followed by Laurenco Premium Protection Sheet.
All exposed flashings and penetrations waterproofed with Laurenco PMMA
Overburden = XGRASS Superlawn Xtreme Synthetic Turf

Ashbury Hotel overview8th floor

Laurenco SPC applied as temporary roof to dry-in allowing interior work to begin.
Adhered Insulation and Coverboard, first layer of insulation adhered in Laurenco Adhesive.
2-layer Laurenco Waterproofing System followed by Laurenco SPC or G-Cap (to be determined)
All exposed flashings and penetrations waterproofed with Laurenco PMMA
Overburden = Elevated steel grating system with 2’ x 2’ x 2” pavers.

ashbury-hotel-completed-2-jpg