Asbury Park Hotel (Salvation Army Hotel)
5th floor
5th floor planned as outdoor gathering area.
Laurenco SPC was applied as temporary roof to dry-in allowing interior work to begin.
Adhered Insulation and coverboard — First layer of insulation adhered in Laurenco Adhesive.
2-layer Laurenco Waterproofing System followed by Laurenco Premium Protection Sheet.
All exposed flashings and penetrations waterproofed with Laurenco PMMA
Overburden = XGRASS Superlawn Xtreme Synthetic Turf
8th floor
Laurenco SPC applied as temporary roof to dry-in allowing interior work to begin.
Adhered Insulation and Coverboard, first layer of insulation adhered in Laurenco Adhesive.
2-layer Laurenco Waterproofing System followed by Laurenco SPC or G-Cap (to be determined)
All exposed flashings and penetrations waterproofed with Laurenco PMMA
Overburden = Elevated steel grating system with 2’ x 2’ x 2” pavers.